Mechanical Installation Source Water
WARNING
LOOP DESIGN IS EXTREMELY IMPORTANT FOR PROPER HEAT PUMP OPERATION.
INCORRECT LOOP DESIGN WILL REDUCE HEAT PUMP EFFICIENCY, CAUSE POOR
PERFORMANCE OR MAY RENDER THE SYSTEM UNUSABLE. CONTACT AN IGSHPA OR
CGC CERTIFIED GEOTHERMAL LOOP CONTRACTOR FOR PROPER INSTALLATIONS.
Water Connections General
The following pages outline typical piping arrangements for the most common source water connection options,
as well as flushing and filling procedures and antifreeze requirements for closed loop systems. Do not connect
copper piping directly to the source water connection points on this unit. A section of flexible piping is
recommended to reduce and isolate vibrations transmitting from the compressor into other parts of the system.
Once closed loops are completed, they must be pressure tested to at least 60 PSI to ensure integrity. Once
pressure is tested, loop must be purged of all foreign debris and filled with fluid. All air must be removed at
this time by flushing the system. (Table 2) shows approximate fluid volumes.
Pressure/Temperature (P/T) plugs Should be installed in the adaptor elbow on the entering
and leaving water line of the heat pump on a closed system. (Figure 3), A thermometer can be
inserted into the P/T ports to check entering and leaving water temperatures. A pressure gauge
can also be inserted into these P/T ports to determine the pressure differential between the
entering and leaving water. This pressure differential can then be compared to the engineering
specifications data to determine the flow rate of the system.
Flow Center if selecting a non-pressurized closed loop design, a flow center is required. A flow center is a
key component to installation ease and long-term reliability.
Loop Pump Selection – Select a loop circulation pump based upon the GPM required and total system pressure
drop. See specification, page 3. Geo heat pump Btu/h capacity and efficiency are directly related to the GPM
flow through the unit.
Vibration pad suggest setting the unit on a sound vibration pad, available from most distributors or
accessories price sheet – R-PAD-2735-1-**.
Water quality models with standard copper heat exchanger coils require the installer to evaluate water
quality and meet minimum water properties.
pH/calcium hardness pH < 7.5 and Ca harness < 100 PPM
Iron fouling < 0.2 PPM (Ferrous)
< 0.5 PPM of oxygen
Hydrogen sulfide (H
2
S) < 0.5 PPM
Chloride levels < 20 PPM
Erosion/clogging < 10 PPM, particles
Filter, if required < 800 micron size